The power unit of the South Ukrainian NPP was connected to the grid, 14 units are operating in the power system
The second power unit of the South-Ukrainian NPP was connected to the grid after updating the software of the turbine control system.
As of December 13, the equipment of the first, second and third power units of the South Ukrainian NPP is operating in the specified mode without any remarks, the press service of the nuclear power plant reports.
According to NPC Ukrenergo, 14 out of 15 power units of nuclear power plants operate in the power system. The power unit No. 4 of the Rivne NPP is in repairs.
Источник: сайт Укрэнерго/Фото
To recap, the Ministry of Energy told why this heating season is special.
Tags: NNEGC "Energoatom", electricity market, YuNPP, power system balance, nuclear power plant, power system, power unit, The Ministry of Energy
Read also
German gas shortage may prevent exports to Europe
France says it can do without Russian supplies
749 settlements de-energized due to hostilities