Such a solution will allow balancing the operation of the power system and increasing the stability of the power supply.
All related supplies in November are blocked.
Unscheduled inspections are due by November 15th.
PGNiG recently signed a contract with ERU.
The parliament adopted the bill in the first reading as a basis.