GTSOU Position on the BNetzA’s decision to temporarily suspend Nord Stream 2 AG certification process

In a span of 24 hours, the German regulator, BNetzA, has made two momentous decisions.

Makohon: Gazprom does not plan to increase gas supplies to the EU

The maximum volume planned for transit is 40 billion m3 per year.

Gazprom says it will exceed the plan for transit through Ukraine

Gas storage facilities of Gazprom in Europe began to empty out.

Gazprom returns gas transit volume to contractual level – Makohon

Gas flow through Ukraine increased 2.5 times in 2019.

Gas consumption will be calculated differently in Ukraine

The Verkhovna Rada supported the transition to energy units.

Makohon: Russia continues to reduce the volume of gas transit to the EU

Since October 1, transit through Ukraine has dropped to 86 million m3 per day.